Sept 2002 to June 2007 – BP Sangachal Oil & Gas Terminal
Location – Baku, Azerbaijan
Tecnomar Offshore personnel held key positions as electrical commissioning engineers and technicians for the Bp operated Sangachal Oil Terminal project phase 1, 2 & 3 in Baku, Azerbaijan. The Sangachal Oil Terminal project requirement was to commission the electrical systems which included main power generation of eight (8) Rolls Royce RB211 turbines with ABB 30 MVA generator sets, MV & LV switchboards, MV distribution transformers, emergency geneartion, Brush Prismic PMS, VFD panels for Compressor drives, UPS cabinets and LV distribution & lighting cabinets.
All of the phases of the Sangachal Oil Terminal were completed successfully on time and within budget. The commissioned electrical systems were handed over to the Bp operations group for start-up activities.